Chapter 1: Disassembly of the Engine |
Page |
Section 1: Removing the Cylinder and Piston |
1 |
Section 2: Removing the Magneto Side Components |
3 |
Section 3: Removing the Primary Drive Components |
4 |
Section 4: Parting the Engine Cases |
8 |
Section 5: Removing the Gearbox Components |
10 |
Section 6: Removing the Crankshaft and Bearings |
11 |
|
|
Chapter 2: Repairing the Engine Components |
|
Section 1: Repairing the Crankshaft Assembly |
13 |
Section 2: How the Transmission Works - |
|
(A) Terminology - Locating and Identifying the Components |
15 |
(B) Power Transmission Through the Gears |
21 |
Section 3: Checking the Gearbox Components for Wear |
27 |
Section 4: Shimming and Gear Engagement |
36 |
Section 5: Repairing the Cylinder and Piston |
48 |
Section 6: Piston Sizing Information |
53 |
Section 7: Installing a New Cylinder Liner |
54 |
|
|
Chapter 1: Operation |
Page |
Section 1: Metering Systems |
87 |
|
|
Double Needle Carburetors |
|
Section 2: 0 to 1/8 Throttle: The Pilot Metering System |
89 |
Section 3: 1/8 to 1/4 Throttle: Slide Cutaway and Mid-Range Needle |
91 |
Section 4: 1/4 to 1/2 Throttle: Slide and Mid-Range MeteringSystem
" |
93 |
Section 5: 1/2 to 3/4 Throttle: Slide Cutaway and High SpeedNeedle |
97 |
Section 6: 3/4 to Full Throttle: Slide and High Speed Main Jet |
99 |
Section 7: The Float Metering Device |
100 |
|
|
Single Needle Carburetors |
|
Section 8: 0 to 1/8 Throttle: The Pilot Metering System |
103 |
Section 9: 1/8 to 1/4 Throttle: Slide Cutaway and Needle Jet |
105 |
Section 10: 1/4 to 3/4 Throttle: Slide Needle Position and BoosterSystem |
107 |
Section 11: 3/4 to Full Throttle: Slide and Main Jet |
109 |
Section 12: The Float Metering Device |
109 |